Data centres
Check rack density, heat rejection and network availability against the actual site. Prioritise measured site capacity and documented lead times.
Documentation reviewed ·
Stages and checks
Cooling and thermal systems
Match rack loop, coolant distribution and building heat rejection. Define leak detection acceptance tests.
Substations, transformers and grid
Request site-specific capacity and connection confirmation with milestones and identified owners.