Industrial risk and resilience
Assess exposure, vulnerability and impact before comparing sourcing scenarios.
Documentation reviewed ·
End-use and end-user controls
- Exposure
- Transactions in items potentially under US jurisdiction.
- Vulnerability
- Undocumented classification or counterparty checks.
- Likelihood
- Unestimated. Requires transaction-specific data.
- Potential impact
- Delay, authorisation requirement or cancellation, depending on the transaction.
- Comparison scenario
- Compare the documented transaction with holding the purchase pending a written assessment.
Source · BIS · EAR Part 744 (en) · Accelerators
Packaging platform dependency
- Exposure
- Designs combining logic and HBM on a qualified platform.
- Vulnerability
- One validated combination of substrate, memory and testing.
- Likelihood
- Unestimated. Requires transaction-specific data.
- Potential impact
- Substitution may require redesign, testing and additional acceptance.
- Comparison scenario
- Compare retaining the approved design with qualifying another platform under the test programme.
Source · TSMC · CoWoS (zh-Hant) · Advanced packaging
Grid connection capacity
- Exposure
- Sites whose commissioning depends on new grid connection capacity.
- Vulnerability
- Schedule relying on an unconfirmed connection date.
- Likelihood
- Unestimated. Requires transaction-specific data.
- Potential impact
- Delayed commissioning and longer equipment idle time.
- Comparison scenario
- Compare phased installation with simultaneous installation after confirming power and cooling.
Source · IEA · Energy and AI (en) · Substations, transformers and grid