Geoeconomic Atlas
Explore industrial regions, infrastructure and trade evidence through a local map and connected profiles.
Geoeconomic AtlasTrade flows and concentrationGeoeconomic scenariosStrategic materials intelligenceGeoeconomic radarSemiconductor trade concentration
Approximate city or region points. Physical land layer without political boundaries or tracking data. Natural Earth · 1:110m physical land · UNECE · UN/LOCODE coordinates
| Place | Layer and status | Evidence |
|---|---|---|
| Hsinchu Science ParkTaiwan | Clusters · Documented | Documented science and industrial park. TSMC’s fab list supports site-level checks.新竹科學園區 · 園區介紹 · TSMC Fab 12 · Hsinchu |
| Kumamoto · JASMJapan | Industry · Approved plan | METI publishes an approved manufacturing plan. Verify facility, process and current allocation separately.経済産業省 · 半導体生産施設整備等計画 · Contract wafer fabrication |
| Pyeongtaek · SamsungSouth Korea | Industry · Announcement | The source documents an EUV foundry line announcement. Verify current phase and availability with project-specific evidence.삼성전자 · 평택 EUV 생산라인 · Contract wafer fabrication |
| Shanghai · SMICMainland China | Industry · Documented | Corporate reporting documents foundry business and presence. Capacity depends on facility and technology.中芯国际 · 半年度报告 2024 · SMIC |
| Phoenix · announced expansionUnited States | Industry · Announcement | This marker represents the expansion announced in 2025. Evaluate the expansion and existing facilities separately.TSMC · Arizona investment announcement · 2025-03 · TSMC |
| Dresden · ESMCGermany | Industry · Documented groundbreaking | Groundbreaking documented in August 2024. Verify current progress before assuming production timing.ESMC · Dresden groundbreaking · 2024-08 · Contract wafer fabrication |
| Port of RotterdamNetherlands | Logistics · Documented | The port authority publishes throughput and services. The point refers to the city. Verify terminal, arrival and transshipment with the agent.Port of Rotterdam · Feiten en cijfers |
| Port of SingaporeSingapore | Logistics · Documented | MPA distinguishes its terminals and their functions. Use the source to identify the operator and terminal.Maritime and Port Authority · Terminals |
| Penang · assembly and testMalaysia | Clusters · Documented | ASE documents assembly and test facilities in Penang. Confirm the service, facility and available volume with each operator.ASE · Manufacturing Facilities Malaysia · OSAT assembly and test |
| Vietnam · semiconductor strategyVietnam | Industrial policy · Public programme | Decision 1018 adopts the national strategy to 2030 with a 2050 vision. Hanoi is an administrative reference point.Chính phủ Việt Nam · Quyết định 1018/QĐ-TTg · 2024-09 · Semiconductors |
| Jujuy · lithiumArgentina | Materials · Documented | The national mining report identifies projects. Permits, grade and availability require project-level information.Secretaría de Minería · Informe sectorial del litio · Argentina |
| Brazil · Brasil SemiconBrazil | Industrial policy · Public programme | The law creates the programme. Brasília is an institutional reference point. Verify regulations and conditions by activity.Presidência da República · Lei 14.968/2024 · 2024-09-11 · Brazil |
| Mexico · KutsariMexico | Industrial policy · Announcement | The presidential announcement documents a design centre. The city is an institutional reference point.Presidencia de México · Centro Kutsari · Mexico |
| Atacama · lithium value chainChile | Materials · Documented | The lithium strategy documents industrial policy. Compare extraction, refined products and local conditions.Gobierno de Chile · Estrategia Nacional del Litio · Chile |
| SEMICON Taiwan 2027Taiwan | Fairs · Announcement | Edition announced for 18–20 August. The point represents the reference city.SEMI · SEMICON Taiwan 2027 · 2027-08-18 · SEMICON Taiwan |
| SEMICON Korea 2027South Korea | Fairs · Announcement | Agenda and activity venues are available in Expo.SEMI · SEMICON Korea 2027 · 2027-02-17 · SEMICON Korea |
| Northern Virginia · power and data centresUnited States | Energy · Study | Virginia’s legislative commission studies data-centre concentration and power impacts. Verify contracted power and timing for each project.Virginia JLARC · Data Centers in Virginia · 2024-12 · Substations, transformers and grid |
| United States · end-use reviewUnited States | Risks · Regulatory reference | Washington represents the issuing jurisdiction. Check scope, current text, item and transaction.BIS · EAR Part 744 · EAR Part 744 |